Harken 1634 ESP stand-up base Bedienungsanleitung

Stöbern Sie online oder laden Sie Bedienungsanleitung nach Hardware Harken 1634 ESP stand-up base herunter. Harken 1634 ESP stand-up base User Manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 2
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
INSTALLATION SHEET
1634 Midrange/Cruising ESP Stand-up Base
N15W24983 Bluemound Road• Pewaukee, WI 53072 U.S.A.
Tel: (262) 691-3320 • Fax: (262) 701-5780
Web: www.harken.com • Email: [email protected]
HARKEN
HARKEN
1. Hold base on side,
bottom facing you.
Compress spring cup
so clevis pin drops out.
2. Put base on flat surface
and press spring cup down.
Insert clevis pin in hole only
thickness of first cylinder
wall.
3. Insert block so post
hole aligns with clevis pin
in base. Push clevis pin
in until spring cup snaps
in place.
Install block on base before mounting base to deck
WARNING! Strictly follow all instructions to avoid an accident,
damage to your vessel, personal injury or death. See www.
harken.com/manuals for additional safety information.
Base Maximum Working Load
3500 lbs (1587 kg)
321
WARNING! To achieve maximum working load of base, mount
as shown on reverse side, using 1/4" (6 mm) SS screws, washers
and locknuts in all four (4) holes. Maximum working load of block
fitted to base is limited to maximum working load of base.
INSTALLATION SHEET
1634 Midrange/Cruising ESP Stand-up Base
N15W24983 Bluemound Road• Pewaukee, WI 53072 U.S.A.
Tel: (262) 691-3320 • Fax: (262) 701-5780
Web: www.harken.com • Email: [email protected]
HARKEN
HARKEN
1. Hold base on side,
bottom facing you.
Compress spring cup
so clevis pin drops out.
2. Put base on flat surface
and press spring cup down.
Insert clevis pin in hole only
thickness of first cylinder
wall.
3. Insert block so post
hole aligns with clevis pin
in base. Push clevis pin
in until spring cup snaps
in place.
Install block on base before mounting base to deck
WARNING! Strictly follow all instructions to avoid an accident,
damage to your vessel, personal injury or death. See www.
harken.com/manuals for additional safety information.
Base Maximum Working Load
3500 lbs (1587 kg)
321
WARNING! To achieve maximum working load of base, mount
as shown on reverse side, using 1/4" (6 mm) SS screws, washers
and locknuts in all four (4) holes. Maximum working load of block
fitted to base is limited to maximum working load of base.
INSTALLATION SHEET
1634 Midrange/Cruising ESP Stand-up Base
N15W24983 Bluemound Road• Pewaukee, WI 53072 U.S.A.
Tel: (262) 691-3320 • Fax: (262) 701-5780
Web: www.harken.com • Email: [email protected]
HARKEN
HARKEN
1. Hold base on side,
bottom facing you.
Compress spring cup
so clevis pin drops out.
2. Put base on flat surface
and press spring cup down.
Insert clevis pin in hole only
thickness of first cylinder
wall.
3. Insert block so post
hole aligns with clevis pin
in base. Push clevis pin
in until spring cup snaps
in place.
Install block on base before mounting base to deck
WARNING! Strictly follow all instructions to avoid an accident,
damage to your vessel, personal injury or death. See www.
harken.com/manuals for additional safety information.
Base Maximum Working Load
3500 lbs (1587 kg)
321
WARNING! To achieve maximum working load of base, mount
as shown on reverse side, using 1/4" (6 mm) SS screws, washers
and locknuts in all four (4) holes. Maximum working load of block
fitted to base is limited to maximum working load of base.
INSTALLATION SHEET
1634 Midrange/Cruising ESP Stand-up Base
N15W24983 Bluemound Road• Pewaukee, WI 53072 U.S.A.
Tel: (262) 691-3320 • Fax: (262) 701-5780
Web: www.harken.com • Email: [email protected]
HARKEN
HARKEN
1. Hold base on side,
bottom facing you.
Compress spring cup
so clevis pin drops out.
2. Put base on flat surface
and press spring cup down.
Insert clevis pin in hole only
thickness of first cylinder
wall.
3. Insert block so post
hole aligns with clevis pin
in base. Push clevis pin
in until spring cup snaps
in place.
Install block on base before mounting base to deck
WARNING! Strictly follow all instructions to avoid an accident,
damage to your vessel, personal injury or death. See www.
harken.com/manuals for additional safety information.
Base Maximum Working Load
3500 lbs (1587 kg)
321
WARNING! To achieve maximum working load of base, mount
as shown on reverse side, using 1/4" (6 mm) SS screws, washers
and locknuts in all four (4) holes. Maximum working load of block
fitted to base is limited to maximum working load of base.
Seitenansicht 0
1 2

Inhaltsverzeichnis

Seite 1 - INSTALLATION SHEET

INSTALLATION SHEET1634 Midrange/Cruising ESP Stand-up BaseN15W24983 Bluemound Road• Pewaukee, WI 53072 U.S.A.Tel: (262) 691-3320 • Fax: (262) 701-5780

Seite 2 - CORRECT INCORRECT

IMPORTANT: Mount base so load is inline with padeye bailHarken equipment requires minimal maintenance, but some is required to give the best service

Kommentare zu diesen Handbüchern

Keine Kommentare